Book a meeting

Data engineering

Nobody can tell you which number is right.

That isn’t a reporting problem. It’s the layer underneath the reports - and we fix that layer, so the answer is the same wherever you look, and getting it takes minutes rather than days.

Not sure that’s your problem? See whether any of this sounds like your week.

ACME LIMITEDAcme Ltd.acme ltdAcme LimitedMatchedAcme LtdFour records, one customerACME LIMITEDAcme Ltd.acme ltdAcme LimitedAcme LtdFour records, one customer

Who this is for

Does any of this sound like your week?

Not a job title - a situation. If more than one of these lands, the problem is underneath your reports rather than in them.

Two reports, two numbers

Sales says one figure, finance says another, and the meeting stops while everyone works out which spreadsheet is older.

It lives in one person’s head

One person knows how the month-end numbers are actually put together. When they’re off, it doesn’t happen.

A simple question takes three days

“How did the north do last quarter?” needs an export, a lookup and an afternoon before anyone can answer it.

You’ve stopped trusting it

The report goes out, but everybody checks it against their own copy first. That copy is the one they actually use.

What changes

Before and after, honestly.

Today

Somebody exports it. Somebody else cleans it. A third person builds the deck. By the time it’s in the meeting it’s four days old, and whoever built it’s the only one who can explain it.

Once it’s built

It lands overnight, already joined up. The meeting opens the report rather than rebuilding it, and when somebody asks a new question they can answer it themselves.

Pelsis had data sitting in seventeen separate entities. We put it in one place, and the time it took them to produce a report halved.

What the fix was worth

Three times the problem was the layer underneath.

Named, because these are published and the clients are happy to be. Not percentages we can’t show you the workings for.

Pelsis

17entities, one warehouse

Seventeen businesses whose data had never been in the same place. We built it onto AWS Redshift so sales and margin could finally be read across the group.

AutoProtect

50–60%fewer requests to the BI team

Disparate data streams and a shadow-BI habit - everyone keeping their own version. We consolidated the streams and moved them off SQL onto Databricks.

Colmore

6.5days a month, handed back

Finance was spending the first week and a half of every month producing numbers rather than reading them. The fix was underneath the reports, not in them.

Swipe for the other two →

What it costs to do this yourself

A data engineer isn’t their salary.

Salary is about two thirds of what one actually costs you. The rest is employer National Insurance, pension, recruitment, a laptop, licences and somewhere to sit. And you can’t hire somebody for six months - so the number that matters is a full year of them, whatever the project turns out to need.

Work it out

Change these to your own numbers.

Hiring them - first year

—

    With us, for the same job

    Priced per project

    • Employer NI, pension, kit, desknone
    • Recruitment, and the months spent recruitingnone
    • Tool and platform licencesours
    • Notice periods and redundancynone
    • When the project endsit stops

    And you aren’t hiring one person’s skillset. Hire an engineer and you get the one skill set you recruited for. There are twenty-odd engineers here across twenty-five people - the warehouse specialist, the Power BI one and whoever has done your ERP before are all already on the team. You get the one the job needs that week, and more than one of them at a time, which is usually why a project finishes sooner than one pair of hands could manage it.

    Employer National Insurance at 15% on pay above £5,000 and employer pension at 3% are the 2025/26 statutory rates. Recruitment at 20% of salary, one-off. Then laptop, software licences and a desk at £6,400 each per year. One year, because that’s the shortest thing you can realistically commit somebody to. Our own price depends on the project rather than on headcount, so it isn’t guessed at here - tell us the job and we’ll put a number on it.

    Send me this, with my numbers

    Your figures on a page of your own - with four questions that would let us price the work properly before we ever meet.

    What you actually get

    Four things, and this is the order they happen in.

    No new system for your team to learn. The last box is the reporting tool you already open every morning.

    1

    Where it lives now

    Your ERP, your CRM, the finance system, and the spreadsheets people actually use. None of them agree.

    2

    We pull it, every night

    Pipelines that run while nobody is watching - and tell you when one of them breaks, before the meeting finds out.

    3

    It lands in one place

    A warehouse, modelled and named the way your business names things, not the way the database does.

    4

    Your reports read from it

    Power BI, ThoughtSpot, whatever you already use - pointed at one set of numbers instead of six.

    The honest bit

    Where this goes wrong.

    Everyone’s brochure says it always works. Here’s when it doesn’t.

    A warehouse won’t fix a bad source system

    If the data is being entered wrong upstream, moving it somewhere tidier just gets you the same wrong number faster. We’ll say so before you spend anything.

    The first correct number causes an argument

    When the real figure is lower than the one people have been quoting, that’s a conversation. Worth planning for rather than being surprised by.

    If nobody owns it, it rots

    This works when someone on your side owns it afterwards. It doesn’t need to be a full-time job, but it does need to be somebody’s.

    How we start

    Three steps, and the first one is free.

    1

    We look at what you’ve

    Half an hour on a call. What systems, what reports, what hurts most.

    2

    We tell you what it takes

    What needs doing, roughly what it costs, and what we would leave alone.

    3

    We build it

    In the stack you already run. Nothing new to vet, nothing to rip out.

    This is the step people skip Step two is where we say if the job is smaller than you feared, or if the real problem is somewhere else entirely. It has talked people out of work more than once.

    Before you book

    The questions we get asked.

    Would it be cheaper to just hire a data engineer?

    It depends whether the work keeps coming. A permanent engineer earns their place when there’s a permanent flow of it. Most of what we get called in for is a defined piece with an end. We price per project rather than per head, so there’s no day rate to multiply up - and the calculator above is about what employing someone costs you, not what we charge.

    Do you need access to our live systems to start?

    Read access is normally enough to work out what is wrong. Nothing gets written to or changed in a production system without you agreeing what is changing and when.

    What happens to our current reporting while the pipelines are rebuilt?

    It keeps running. The new route is built alongside the old one and nothing is switched off until the numbers coming out of it are trusted. There is no cutover weekend.

    We already have a data team. Does that change anything?

    Usually it makes the job narrower - a specific gap, a platform nobody has used before, or capacity for a defined push. We would rather hand something back to your team than keep hold of it.

    Two systems disagree. Who decides which one is right?

    You do. Whether a cancelled order still counts as a sale is a business decision rather than a technical one, and the build stalls until somebody rules on it. We push for that early, because it’s the thing most likely to hold up everything behind it.

    What if the job turns out to be smaller than we thought?

    Then we say so. A fair amount of what arrives described as a pipeline problem turns out to be two systems that have never agreed on a customer reference, which is days of work rather than months.

    Next step

    Worth half an hour?

    Half an hour with the people who build these, not a salesperson. Bring a report you don’t trust and we’ll tell you what’s underneath it.

    • No prep needed, and nothing to sign
    • We’ll tell you if data engineering isn’t what you need
    • You’ll get a straight answer on rough cost

    Two ways to do it

    Book straight into our calendar

    or

    Send me details first

    Usually within a few hours. The next working day at the latest.

    Send it over

    Where shall we send it?

    Name, email and a number, and it’s with you in a minute.